{"id":1746,"date":"2022-06-02T07:31:00","date_gmt":"2022-06-02T07:31:00","guid":{"rendered":"http:\/\/192.168.0.63\/NextPlus\/?p=1746"},"modified":"2022-10-18T07:08:51","modified_gmt":"2022-10-18T07:08:51","slug":"kulla-roche-e-bazelit-projektimi-i-nderteses-se-re-me-te-larte-ne-zvicer","status":"publish","type":"post","link":"https:\/\/nextplus.al\/en\/2022\/06\/02\/kulla-roche-e-bazelit-projektimi-i-nderteses-se-re-me-te-larte-ne-zvicer\/","title":{"rendered":"Kulla (Roche) e Bazelit: Projektimi i nd\u00ebrtes\u00ebs s\u00eb re m\u00eb t\u00eb lart\u00eb n\u00eb Zvic\u00ebr"},"content":{"rendered":"<p>Roche Tower 2 nuk do t\u00eb jet\u00eb vet\u00ebm nd\u00ebrtesa m\u00eb e lart\u00eb n\u00eb Zvic\u00ebr. Po vendos gjithashtu standarde t\u00eb reja si p\u00ebr q\u00ebndrueshm\u00ebrin\u00eb ashtu edhe p\u00ebr p\u00ebrdorimin e binjak\u00ebve dixhital\u00eb.<\/p>\n\n\n\n<p>\u00b7&nbsp;<strong>Firma farmaceutike Roche \u00ebsht\u00eb duke nd\u00ebrtuar selin\u00eb e saj t\u00eb re: rrokaqiellin i cili do t\u00eb b\u00ebhet kulla m\u00eb e lart\u00eb n\u00eb Zvic\u00ebr.<br><\/strong>\u00b7&nbsp;<strong>Fal\u00eb mjeteve dixhitale, nd\u00ebrtesa \u2013 e quajtur Roche Tower 2 \u2013 do t\u00eb p\u00ebrfundoj\u00eb p\u00ebrpara afatit.<br><\/strong>\u00b7&nbsp;<strong>Projekti Tower 2 \u00ebsht\u00eb shembullor si n\u00eb aspektin e q\u00ebndrueshm\u00ebris\u00eb ashtu edhe n\u00eb at\u00eb se \u00e7do hap i nd\u00ebrtimit p\u00ebrfshinte BIM-in.<\/strong><\/p>\n\n\n\n<p>Pavar\u00ebsisht n\u00ebse gjendeni n\u00eb nj\u00eb nga urat q\u00eb kalojn\u00eb lumin e Rinit n\u00eb Bazel, Zvic\u00ebr, apo duke eksploruar Qytetin e vjet\u00ebr t\u00eb qytetit, do t\u00eb shihni qart\u00eb kullat binjake n\u00eb t\u00eb cil\u00ebn \u00ebsht\u00eb selia e korporat\u00ebs Roche, nj\u00eb nd\u00ebr kompanit\u00eb farmaceutike m\u00eb t\u00eb suksesshme n\u00eb bot\u00eb.<\/p>\n\n\n\n<p>Roche Tower 1 \u00ebsht\u00eb p\u00ebrfunduar n\u00eb vitin 2015. Tower 2 \u00ebsht\u00eb aktualisht n\u00eb nd\u00ebrtim. Me 584 k\u00ebmb\u00eb, Tower 1 \u00ebsht\u00eb ende zyrtarisht nd\u00ebrtesa m\u00eb e lart\u00eb n\u00eb Zvic\u00ebr, edhe pse v\u00ebllai i saj m\u00eb i vog\u00ebl \u00ebsht\u00eb duke u formuar t\u00eb jet\u00eb shum\u00eb m\u00eb i gjat\u00eb. N\u00eb dit\u00ebn e inaugurimit, Tower 2, e cila do t\u00eb jet\u00eb e gjat\u00eb 673 k\u00ebmb\u00eb, do t\u00eb b\u00ebhet mbajt\u00ebsi i ri i rekordit. Kulla do t\u00eb jet\u00eb 53 kate e lart\u00eb dhe do t\u00eb strehoj\u00eb m\u00eb shum\u00eb se 3,400 punonj\u00ebs t\u00eb Roche.<\/p>\n\n\n\n<p>I planifikuar p\u00ebr maj t\u00eb vitit 2022, inaugurimi i kull\u00ebs s\u00eb re t\u00eb biznesit vjen nj\u00eb vit pas kremtimit t\u00eb 125-vjetorit t\u00eb Roche. Kur kompania u themelua n\u00eb 1896, e gjith\u00eb zona p\u00ebrreth ishte fusha dhe livadhe. \u00cbsht\u00eb e qart\u00eb se shum\u00eb\u00e7ka ka ndryshuar.<\/p>\n\n\n\n<p>Blloku i ri i zyr\u00ebs q\u00ebndron n\u00eb nj\u00eb k\u00ebnd me v\u00ebllain e tij m\u00eb t\u00eb vjet\u00ebr dhe ka po t\u00eb nj\u00ebjtin dizajn konik t\u00eb shkall\u00ebve. Dy kullat dominojn\u00eb tani zon\u00ebn Roche, nd\u00ebrsa studimet e fizibilitetit jan\u00eb duke u kryer p\u00ebr nd\u00ebrtes\u00ebn e tret\u00eb. N\u00ebse realizohet, rrokaqiell i tret\u00eb i grupit do t\u00eb ngrihet 66 k\u00ebmb\u00eb m\u00eb lart se Tower 2.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"500\" src=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/r.webp\" alt=\"\" class=\"wp-image-2542\" srcset=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/r.webp 700w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/r-300x214.webp 300w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/r-18x12.webp 18w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Roche Tower 2: P\u00ebrdorimi i fuqis\u00eb s\u00eb BIM-it<\/h3>\n\n\n\n<p>Firma arkitekturore zvicerane Herzog &amp; de Meuron \u00ebsht\u00eb p\u00ebrgjegj\u00ebse p\u00ebr Roche Towers 1 dhe 2. Roche, Herzog &amp; de Meuron dhe kontraktori i p\u00ebrgjithsh\u00ebm Drees &amp; Sommer kan\u00eb punuar t\u00eb gjith\u00eb s\u00eb bashku n\u00eb projektin Kulla 1.<\/p>\n\n\n\n<p>J\u00f6rg Keller, menaxher i projektit p\u00ebr Tower 2 n\u00eb Roche, \u00ebsht\u00eb p\u00ebrgjegj\u00ebs p\u00ebr v\u00ebnien n\u00eb pun\u00eb teknike t\u00eb t\u00eb gjitha objekteve n\u00eb nd\u00ebrtes\u00ebn e re, \u00ebsht\u00eb i angazhuar p\u00ebr sigurin\u00eb dhe mban nj\u00eb \u201ekapel\u00eb t\u00eb tret\u00eb\u201c si ekspert p\u00ebr BIM (Building Information Modeling). Ai dhe ekipi i projektit jan\u00eb p\u00ebrgjegj\u00ebs p\u00ebr t\u00eb gjith\u00eb planifikimin bashk\u00ebpunues. Fal\u00eb pun\u00ebs s\u00eb tyre, edhe para se t\u00eb ngriheshin historit\u00eb e ndryshme p\u00ebr Tower 2, ishte e mundur t\u00eb eksplorohej \u00e7do kat deri n\u00eb \u00e7ati n\u00eb modelin e tij BIM.<\/p>\n\n\n\n<p>Klienti, arkitekti, kontraktori i p\u00ebrgjithsh\u00ebm dhe kompanit\u00eb e nd\u00ebrtimit donin t\u00eb p\u00ebrdornin BIM-in n\u00eb projekt q\u00eb nga fillimi. \u201eGjithmon\u00eb kemi nevoj\u00eb p\u00ebr njer\u00ebz t\u00eb cil\u00ebt jan\u00eb shum\u00eb entuziast\u00eb dhe 100% t\u00eb p\u00ebrkushtuar p\u00ebr ta realizuar at\u00eb,\u201c thot\u00eb Keller. Me \u201eat\u00eb\u201c, n\u00ebnkupton BIM ose bashk\u00ebpunim i cili p\u00ebrdor metodat BIM dhe modelin virtual 3D. \u201eModeli 3D \u00ebsht\u00eb krijuar p\u00ebr Tower 1, por nuk ishte aq i avancuar sa modeli p\u00ebr Tower 2,\u201c thot\u00eb Keller.<\/p>\n\n\n\n<p>Modeli dixhital filloi t\u00eb merrte form\u00eb nj\u00eb vit e gjysm\u00eb p\u00ebrpara p\u00ebrfundimit t\u00eb punimeve t\u00eb vrazhda, nd\u00ebrsa Autodesk Revit ishte nj\u00eb nga programet softuerike t\u00eb p\u00ebrdorura p\u00ebr krijimin e tij.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"500\" src=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/t.webp\" alt=\"\" class=\"wp-image-2543\" srcset=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/t.webp 700w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/t-300x214.webp 300w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/t-18x12.webp 18w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"500\" src=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/y.webp\" alt=\"\" class=\"wp-image-2544\" srcset=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/y.webp 700w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/y-300x214.webp 300w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/y-18x12.webp 18w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<p>Klienti, arkitekti, kontraktori i p\u00ebrgjithsh\u00ebm dhe kompanit\u00eb e nd\u00ebrtimit donin t\u00eb p\u00ebrdornin BIM-in n\u00eb projekt q\u00eb nga fillimi. \u201eGjithmon\u00eb kemi nevoj\u00eb p\u00ebr njer\u00ebz t\u00eb cil\u00ebt jan\u00eb shum\u00eb entuziast\u00eb dhe 100% t\u00eb p\u00ebrkushtuar p\u00ebr ta realizuar at\u00eb,\u201c thot\u00eb Keller. Me \u201eat\u00eb\u201c, n\u00ebnkupton BIM ose bashk\u00ebpunim i cili p\u00ebrdor metodat BIM dhe modelin virtual 3D. \u201eModeli 3D \u00ebsht\u00eb krijuar p\u00ebr Tower 1, por nuk ishte aq i avancuar sa modeli p\u00ebr Tower 2,\u201c thot\u00eb Keller.<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">P\u00ebrvet\u00ebsimi i pal\u00ebve t\u00eb interesuara me nj\u00eb xhiro virtuale<\/h3>\n\n\n\n<p>Megjithat\u00eb, ishte m\u00eb e leht\u00eb t\u00eb bindeshin vendimmarr\u00ebsit n\u00eb Roche. P\u00ebr t\u00eb marr\u00eb blerjen e tyre, Keller p\u00ebrdori nj\u00eb model virtual t\u00eb bazuar n\u00eb kompjuter dhe syze t\u00eb realitetit virtual (VR). Xhiroja virtuale e nd\u00ebrtes\u00ebs, e cila \u00ebsht\u00eb ende n\u00eb nd\u00ebrtim ka definitivisht nj\u00eb efekt wow. Ftesa e pal\u00ebve kryesore t\u00eb interesuara n\u00eb nj\u00eb xhiro VR b\u00ebri t\u00eb mundur q\u00eb t\u2019i bindeshin ata q\u00eb gj\u00ebrat ishin n\u00eb rrug\u00ebn e duhur q\u00eb n\u00eb fillim.<\/p>\n\n\n\n<p>Ndon\u00ebse xhiroja VR mund t\u2019i ket\u00eb ofruar menaxherit t\u00eb nd\u00ebrtimit apo menaxherit t\u00eb pasurive t\u00eb paluajtshme nj\u00eb p\u00ebrvoj\u00eb spektakolare, n\u00eb fund, ishte gjithashtu nj\u00eb seri faktesh t\u00eb forta q\u00eb v\u00ebrtetuan se p\u00ebrkrah\u00ebsit e BIM-it kishin t\u00eb drejt\u00eb dhe se i bindi dyshuesit. Modeli 3D ka ndihmuar ekipet t\u00eb p\u00ebrfundonin n\u00eb m\u00ebnyr\u00eb efikase projektin me nj\u00eb shkall\u00eb m\u00eb t\u00eb lart\u00eb cil\u00ebsie gjat\u00eb gjith\u00eb faz\u00ebs s\u00eb p\u00ebrgatitjes dhe nd\u00ebrtimit.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"500\" src=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/u.webp\" alt=\"\" class=\"wp-image-2545\" srcset=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/u.webp 700w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/u-300x214.webp 300w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/u-18x12.webp 18w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"500\" src=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/i.webp\" alt=\"\" class=\"wp-image-2546\" srcset=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/i.webp 700w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/i-300x214.webp 300w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/i-18x12.webp 18w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Shenj\u00eb e dukshme ndryshimi: Tabletat z\u00ebvend\u00ebsojn\u00eb projektet<\/h3>\n\n\n\n<p>Keller ishte p\u00ebrgjegj\u00ebs p\u00ebr v\u00ebnien n\u00eb pun\u00eb t\u00eb Tower 1 dhe ka qen\u00eb pjes\u00eb e projektit t\u00eb nd\u00ebrtes\u00ebs s\u00eb re q\u00eb nga fillimi. Madje atij dhe nj\u00eb kolegu i \u00ebsht\u00eb dh\u00ebn\u00eb nderi t\u00eb ulnin \u201ckapsul\u00ebn kohore\u201d n\u00eb themel n\u00eb ceremonin\u00eb e hapjes s\u00eb themelit m\u00eb 11 qershor 2018. N\u00eb t\u00eb ishte nj\u00eb gazet\u00eb e p\u00ebrditshme e Bazelit, ftesat p\u00ebr t\u00eb ftuarit e nderit, nj\u00eb shkop USB dhe plane nd\u00ebrtimi t\u00eb printuara. Fakti q\u00eb projektet 2D u gropos\u00ebn mund t\u00eb ket\u00eb gjithashtu nj\u00eb kuptim disi simbolik, pasi projektet e letr\u00ebs po p\u00ebrdoreshin gjithnj\u00eb e m\u00eb pak n\u00eb projektin e nd\u00ebrtimit n\u00eb bot\u00ebn reale.<\/p>\n\n\n\n<p>\u201eI vetmi ndryshim n\u00eb projektin Tower 1 q\u00eb t\u00eb gjith\u00eb mund ta shohin \u00ebsht\u00eb se, n\u00eb at\u00eb koh\u00eb, un\u00eb isha i vetmi n\u00eb kantier me nj\u00eb iPad,\u201c thot\u00eb Keller. \u201eNga ana tjet\u00ebr, gjat\u00eb nd\u00ebrtimit t\u00eb Tower 2 do t\u00eb shihni rregullisht menaxher\u00ebt e projektit, punonj\u00ebsit dhe kontraktor\u00ebt e ndrysh\u00ebm me nj\u00eb tablet\u00eb n\u00eb dor\u00eb.\u201c<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Binjaku dixhital: Shoq\u00ebrues i vazhduesh\u00ebm n\u00eb t\u00eb gjitha fazat e Tower 2<\/h3>\n\n\n\n<p>P\u00ebrfitimet e simulimit dixhital jan\u00eb b\u00ebr\u00eb t\u00eb dukshme n\u00eb fillim t\u00eb projektit, madje edhe para se kompanit\u00eb e nd\u00ebrtimit t\u00eb fillonin t\u00eb punonin:<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">P\u00ebrgatitja perfekte p\u00ebr n\u00ebnkontraktor\u00ebt<\/h3>\n\n\n\n<p>Modeli ishte n\u00eb dispozicion p\u00ebr t\u00eb gjitha kompanit\u00eb e p\u00ebrfshira n\u00eb procese t\u00eb ndryshme nd\u00ebrtimi edhe para n\u00ebnshkrimit t\u00eb kontrat\u00ebs. Kjo do t\u00eb thoshte se ata mund t\u00eb llogaritnin paraprakisht sasit\u00eb e nevojshme t\u00eb materialeve, t\u00eb tilla si betoni dhe \u00e7eliku.<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Detaje t\u00eb p\u00ebrmir\u00ebsuara<\/h3>\n\n\n\n<p>Fal\u00eb modelit dixhital, shum\u00eb detaje t\u00eb tjera t\u00eb nd\u00ebrtes\u00ebs mund t\u00eb modelohen paraprakisht. Pun\u00ebtori i nd\u00ebrtimit n\u00eb terren, p\u00ebr shembull, mund t\u00eb shoh\u00eb qart\u00eb se ku do t\u00eb instalohet priza n\u00eb mur dhe ku duhet t\u00eb kalojn\u00eb kabllot.<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Gabimet e minimizuara dhe m\u00eb pak pun\u00eb shtes\u00eb<\/h3>\n\n\n\n<p>Gabimet e planifikimit mund t\u00eb zbulohen n\u00eb modelin 3D n\u00eb vend q\u00eb t\u00eb zbulohen n\u00eb kantier.<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Nd\u00ebrtim m\u00eb i shpejt\u00eb<\/h3>\n\n\n\n<p>N\u00eb koh\u00ebn kur vonesat dhe kostot e m\u00ebdha jan\u00eb kaq t\u00eb zakonshme n\u00eb industrin\u00eb e nd\u00ebrtimit, p\u00ebrfundimi i fazave t\u00eb nj\u00eb projekti nd\u00ebrtimi t\u00eb k\u00ebsaj shkalle m\u00eb shpejt se sa pritej paraqet nj\u00eb arritje revolucionare. Edhe pse nd\u00ebrtesa nuk do t\u00eb p\u00ebrfundoj\u00eb deri n\u00eb vitin 2022, punimet e vrazhda t\u00eb Tower 2 jan\u00eb tashm\u00eb t\u00eb kryera. Betoni i fundit \u00ebsht\u00eb derdhur m\u00eb 1 dhjetor 2020: dy muaj p\u00ebrpara kohe!<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Besueshm\u00ebria dhe transparenca e planifikimit<\/h3>\n\n\n\n<p>Modeli BIM ka ofruar nj\u00eb baz\u00eb t\u00eb p\u00ebrbashk\u00ebt p\u00ebr monitorimin e progresit t\u00eb nd\u00ebrtimit p\u00ebr ekipin e projektit n\u00eb Roche dhe Omnicon, kompania p\u00ebrgjegj\u00ebse p\u00ebr menaxhimin e nd\u00ebrtimit. Ekipi i udh\u00ebhequr nga Marc R\u00fcstig, menaxheri i projektit, menaxhimi i nd\u00ebrtimit n\u00eb Roche, ka lidhur planin me dimensionin e kat\u00ebrt: koh\u00ebn. \u201e\u00cbsht\u00eb e thjesht\u00eb t\u00eb vizualizosh madje edhe proceset m\u00eb komplekse t\u00eb nd\u00ebrtimit,\u201c thot\u00eb ai. P\u00ebr shembull, 2800 element\u00ebt e fasad\u00ebs jan\u00eb dor\u00ebzuar n\u00eb koh\u00ebn e duhur, duke parandaluar grumbullimin e materialeve n\u00eb kantierin e nd\u00ebrtimit.<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Informacion i centralizuar<\/h3>\n\n\n\n<p>\u201eGjat\u00eb punimit n\u00eb Tower 1, t\u00eb gjith\u00eb kan\u00eb sh\u00ebnuar artikuj t\u00eb hapur n\u00eb listat e tyre n\u00eb Word ose Excel ose i shkruanin ato n\u00eb nj\u00eb bllok,\u201c thot\u00eb Keller. \u201eSot, gjith\u00e7ka \u00ebsht\u00eb e bashkuar n\u00eb m\u00ebnyr\u00eb qendrore n\u00eb [Autodesk] BIM 360 dhe t\u00eb gjith\u00eb kan\u00eb akses n\u00eb t\u00eb nj\u00ebjtin informacion.\u201c Ekipi arkitektonik n\u00eb Herzog &amp; de Meuron sheh gjithashtu nj\u00eb avantazh t\u00eb madh n\u00eb ofrimin e m\u00eb shum\u00eb pal\u00ebve t\u00eb interesuara t\u00eb projektit me akses n\u00eb informacione t\u00eb qarta dhe t\u00eb p\u00ebrdit\u00ebsuara. Ata shpjegojn\u00eb se informacioni \u00ebsht\u00eb m\u00eb pak ambivalent n\u00eb modelin BIM sesa n\u00eb vizatimet e shk\u00ebmbyera, gj\u00eb q\u00eb rezulton n\u00eb m\u00eb pak hap\u00ebsir\u00eb \u200b\u200bp\u00ebr t\u00eb interpretuar informacionin dhe aft\u00ebsi p\u00ebr t\u00eb koordinuar duke iu referuar informacionit t\u00eb paqart\u00eb dhe t\u00eb lexuesh\u00ebm nga makina. Ata gjithashtu theksojn\u00eb se kjo, nga ana tjet\u00ebr, vendos k\u00ebrkesa t\u00eb larta p\u00ebr cil\u00ebsin\u00eb e modelit p\u00ebr sa i p\u00ebrket sakt\u00ebsis\u00eb, vlefshm\u00ebris\u00eb dhe thell\u00ebsis\u00eb s\u00eb informacionit.<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Tabletat ofrojn\u00eb garanci t\u00eb cil\u00ebsis\u00eb<\/h3>\n\n\n\n<p>T\u00eb gjith\u00eb, nga kryepun\u00ebtori q\u00eb koordinon kallepin dhe pun\u00ebtori q\u00eb shtron tubacionet apo instalon ashensor\u00ebt, deri tek menaxher\u00ebt e kantierit t\u00eb nd\u00ebrtimit, p\u00ebr monitorimin e progresit p\u00ebrdorin simulimin e krijuar me Fush\u00ebn BIM 360 p\u00ebr krahasim dhe zbulim t\u00eb devijimeve. \u201eDevijimet dokumentohen dhe gjurmohen n\u00eb m\u00ebnyr\u00eb dixhitale,\u201c thot\u00eb R\u00fcstig n\u00eb nj\u00eb video q\u00eb ai postoi n\u00eb LinkedIn. P\u00ebr m\u00eb pak se tre minuta e gjysm\u00eb, ai tregon se si mjetet dixhitale mund t\u00eb p\u00ebrdoren p\u00ebr t\u00eb arritur sakt\u00ebsi n\u00eb projektet e m\u00ebdha t\u00eb nd\u00ebrtimit.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"665\" src=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/o-1536x998-1-1024x665.webp\" alt=\"\" class=\"wp-image-2548\" srcset=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/o-1536x998-1-1024x665.webp 1024w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/o-1536x998-1-300x195.webp 300w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/o-1536x998-1-768x499.webp 768w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/o-1536x998-1-18x12.webp 18w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/o-1536x998-1.webp 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">BIM lul\u00ebzon n\u00eb bashk\u00ebpunim<\/h3>\n\n\n\n<p>Ndon\u00ebse BIM po fiton popullaritet n\u00eb industrin\u00eb e nd\u00ebrtimit, Herzog &amp; de Meuron thon\u00eb se binjak\u00ebt e plot\u00eb dixhital jan\u00eb ende nj\u00eb p\u00ebrjashtim. Pengesa, t\u00eb cil\u00ebn ekipi kryesor i projektit duhej t\u00eb kap\u00ebrcente ishte koordinimi i m\u00ebnyr\u00ebs se si shk\u00ebmbehen t\u00eb dh\u00ebnat dhe si t\u00eb sigurohej q\u00eb t\u00eb dh\u00ebnat t\u00eb mos humbasin.<\/p>\n\n\n\n<p>\u201eHumbja e t\u00eb dh\u00ebnave \u00ebsht\u00eb nj\u00eb rrezik i madh,\u201c thot\u00eb Keller. Ai beson se p\u00ebrkushtimi i koh\u00ebs s\u00eb mjaftueshme p\u00ebr p\u00ebrcaktimin e rregullave q\u00eb n\u00eb faz\u00ebn e konceptit \u00ebsht\u00eb di\u00e7ka q\u00eb ia vlen. Arkitekt\u00ebt e Herzog &amp; de Meuron theksojn\u00eb se teknologjia \u00ebsht\u00eb vet\u00ebm nj\u00eb aspekt i k\u00ebtij procesi, duke shpjeguar se \u00ebsht\u00eb gjithashtu e nevojshme t\u00eb p\u00ebrcaktohen q\u00ebllimet e p\u00ebrbashk\u00ebta, t\u00eb zgjidhen konfliktet dhe t\u00eb harmonizohen kapacitetet e ndryshme t\u00eb t\u00eb gjith\u00eb pal\u00ebve t\u00eb interesuara.<\/p>\n\n\n\n<p>Dhe nuk duhet harruar se n\u00ebnkontraktor\u00ebt p\u00ebrgjegj\u00ebs p\u00ebr aspekte t\u00eb ndryshme t\u00eb nd\u00ebrtimit duhet t\u00eb jen\u00eb gjithashtu n\u00eb gjendje t\u00eb merren me BIM-in dhe modelet dixhitale. \u201eDuhet t\u00eb jeni n\u00eb gjendje t\u00eb mir\u00ebmbani dhe m\u00eb pas t\u00eb p\u00ebrshtatni modelin,\u201c thot\u00eb Keller. \u201eKontraktori i p\u00ebrgjithsh\u00ebm ka ndihmuar firmat, t\u00eb cilat kishin m\u00eb pak p\u00ebrvoj\u00eb n\u00eb BIM.<\/p>\n\n\n\n<p>\u201c&nbsp;P\u00ebrdorimi i modelit 3D \u00e7on drejt asaj q\u00eb t\u00eb ket\u00eb m\u00eb shum\u00eb pun\u00eb n\u00eb fillim t\u00eb projektit, por t\u00eb gjith\u00eb ata q\u00eb p\u00ebrfshihen n\u00eb procesin e nd\u00ebrtimit dhe t\u00eb gjith\u00eb operator\u00ebt e ardhsh\u00ebm p\u00ebrfitojn\u00eb nga fakti se nd\u00ebrtesa tashm\u00eb \u00ebsht\u00eb krijuar virtualisht. Keller \u00ebsht\u00eb i bindur se ekipi i Roche Tower ka punuar \u201em\u00eb shpejt dhe n\u00eb m\u00ebnyr\u00eb m\u00eb efikase me BIM-in.\u201c<\/p>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Modeli 3D hap rrug\u00ebn p\u00ebr nd\u00ebrtimin e zgjuar<\/h3>\n\n\n\n<p>Vet\u00ebm pas hapjes dhe p\u00ebrdorimit t\u00eb nd\u00ebrtes\u00ebs mund t\u00eb shohim se modeli virtual ka luajtur nj\u00eb rol t\u00eb r\u00ebnd\u00ebsish\u00ebm. Gjithnj\u00eb e m\u00eb shum\u00eb informacion i shtohet modelit dixhital nd\u00ebrsa projekti i nd\u00ebrtimit p\u00ebrparon, duke i hapur rrug\u00ebn funksionimit m\u00eb efikas dhe t\u00eb q\u00ebndruesh\u00ebm t\u00eb nd\u00ebrtes\u00ebs p\u00ebrmes nj\u00eb binjake dixhitale. \u00cbsht\u00eb e mundur t\u00eb ruhen t\u00eb gjitha t\u00eb dh\u00ebnat teknike p\u00ebrkat\u00ebse, t\u00eb cilat m\u00eb pas mund t\u00eb merren m\u00eb von\u00eb nga pronar\u00ebt dhe ekipet e mir\u00ebmbajtjes.<\/p>\n\n\n\n<p>Pasi nd\u00ebrtesa t\u00eb ket\u00eb p\u00ebrfunduar, binjaku, i krijuar duke p\u00ebrdorur Revit dhe BIM 360, mund t\u00eb p\u00ebrdoret p\u00ebr detyra t\u00eb tilla si mir\u00ebmbajtja parashikuese. Ashensor\u00ebt jan\u00eb t\u00eb pajisur me sensor\u00eb, andaj, n\u00ebse sistemi v\u00ebren ndonj\u00eb parregullsi, at\u00ebher\u00eb inicion testin. T\u00eb dh\u00ebnat e drejtp\u00ebrdrejta n\u00eb modelin virtual mund t\u00eb p\u00ebrdoren gjithashtu p\u00ebr t\u00eb monitoruar konsumin e energjis\u00eb dhe ujit t\u00eb pijsh\u00ebm. Roche d\u00ebshiron t\u00eb p\u00ebrdor\u00eb sistemin p\u00ebr monitorimin e energjis\u00eb p\u00ebr t\u00eb v\u00ebrtetuar se Tower 2 do t\u00eb konsumoj\u00eb rreth 10% m\u00eb pak energji sesa nd\u00ebrtesat e krahasueshme n\u00eb Evrop\u00eb.<\/p>\n\n\n\n<p>Aplikacioni p\u00ebr mir\u00ebmbajtjen e nd\u00ebrtes\u00ebs s\u00eb kull\u00ebs ka funksione t\u00eb dobishme dhe t\u00eb gatshme p\u00ebr ata t\u00eb cil\u00ebt punojn\u00eb atje. Nj\u00eb shembull \u00ebsht\u00eb funksioni i k\u00ebrkimit, i cili mund t\u00eb p\u00ebrdoret p\u00ebr t\u00eb lokalizuar ndonj\u00eb punonj\u00ebs, t\u00eb cilin Keller e identifikon si \u201emjaft t\u00eb zgjuar kur keni 3,400 punonj\u00ebs t\u00eb shp\u00ebrndar\u00eb n\u00eb 41 kate zyrash.\u201c Aplikacioni gjithashtu i b\u00ebn gj\u00ebrat m\u00eb t\u00eb lehta p\u00ebr ekipin e pastrimit, i cili mund t\u00eb shoh\u00eb se cilat zyra jan\u00eb p\u00ebrdorur n\u00eb t\u00eb v\u00ebrtet\u00eb.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"500\" src=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/p.webp\" alt=\"\" class=\"wp-image-2549\" srcset=\"https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/p.webp 700w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/p-300x214.webp 300w, https:\/\/nextplus.al\/wp-content\/uploads\/2022\/10\/p-18x12.webp 18w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<div class=\"space\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Qilima prej rrjeti peshkimi<\/h3>\n\n\n\n<p>Q\u00ebndrueshm\u00ebria ka luajtur nj\u00eb rol t\u00eb r\u00ebnd\u00ebsish\u00ebm p\u00ebr Roche madje edhe para fillimit t\u00eb nd\u00ebrtimit. Kompania kishte m\u00eb shum\u00eb se 900 materiale nd\u00ebrtimi t\u00eb testuara p\u00ebr ndot\u00ebs t\u00eb mundsh\u00ebm. N\u00eb t\u00eb ardhmen, \u00e7do material i pastruar q\u00eb \u00ebsht\u00eb p\u00ebrdorur do t\u00eb ket\u00eb madje edhe pasaport\u00ebn e vet.<\/p>\n\n\n\n<p>Pasaporta do t\u00eb p\u00ebrmbaj\u00eb informacione si p\u00ebr shembull, sa material nd\u00ebrtimi mund t\u00eb riciklohet. Shifra totale \u00ebsht\u00eb aktualisht n\u00eb 58%. Nj\u00eb shembull tjet\u00ebr i q\u00ebndrueshm\u00ebris\u00eb s\u00eb jasht\u00ebzakonshme \u00ebsht\u00eb p\u00ebrdorimi i rrjetave t\u00eb peshkimit t\u00eb ricikluara p\u00ebr t\u00eb krijuar qilima. Ky \u00ebsht\u00eb praktikisht parimi i projektimit rigjenerues, sipas t\u00eb cilit materialet kthehen n\u00eb ciklin material me vler\u00eb t\u00eb barabart\u00eb.<\/p>\n\n\n\n<p>Pasi t\u00eb p\u00ebrfundoj\u00eb nd\u00ebrtimi, nuk do t\u00eb jet\u00eb vet\u00ebm lart\u00ebsia e Kull\u00ebs Roche ajo q\u00eb t\u00ebrheq v\u00ebmendjen. P\u00ebrfundimi i saj do t\u00eb d\u00ebshmoj\u00eb se p\u00ebrdorimi i mjeteve dixhitale mund t\u00eb rris\u00eb cil\u00ebsin\u00eb dhe produktivitetin gjat\u00eb nd\u00ebrtimit. Modeli virtual do t\u00eb krijoj\u00eb gjithashtu kushtet p\u00ebr funksionimin e kursimit t\u00eb energjis\u00eb, duke i lejuar kull\u00ebs t\u00eb vendos\u00eb standarde t\u00eb reja n\u00eb drejtim t\u00eb q\u00ebndrueshm\u00ebris\u00eb. Roche Tower 2 do t\u00eb mbetet projekti kryesor p\u00ebr nj\u00eb koh\u00eb t\u00eb gjat\u00eb, madje edhe n\u00ebse Tower 3 pretendon p\u00ebrfundimisht titullin e saj t\u00eb nd\u00ebrtes\u00ebs m\u00eb t\u00eb lart\u00eb t\u00eb Zvicr\u00ebs.<\/p>\n\n\n\n<div class=\"space\"><\/div>","protected":false},"excerpt":{"rendered":"<p>Roche Tower 2 nuk do t\u00eb jet\u00eb vet\u00ebm nd\u00ebrtesa m\u00eb e lart\u00eb n\u00eb Zvic\u00ebr.Po vendos gjithashtu standarde t\u00eb reja si p\u00ebr q\u00ebndrueshm\u00ebrin\u00eb&#8230;<\/p>","protected":false},"author":5,"featured_media":2571,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","footnotes":""},"categories":[7],"tags":[12],"class_list":["post-1746","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solution","tag-autodesk"],"_links":{"self":[{"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/posts\/1746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/comments?post=1746"}],"version-history":[{"count":0,"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/posts\/1746\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/media\/2571"}],"wp:attachment":[{"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/media?parent=1746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/categories?post=1746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nextplus.al\/en\/wp-json\/wp\/v2\/tags?post=1746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}